Case studies

Case studies

Proven results across retail, manufacturing and logistics.

We combine strategy, AI-driven automation and purpose-built software to deliver predictable results. Explore outcomes by industry and solution.

Industry

Automated small-parts warehouse for Škoda Auto

An automated small-parts warehouse for Škoda Auto in Kvasiny — replacing 42 manual workplaces and saving CZK 26 million per year — while automating the flow from suppliers all the way to the assembly line.

  • 42Manual workplaces saved
  • CZK 26MAnnual savings
  • 12 + 4Rack stackers + robotic arms
Show case study →

Better availability and fresher stock at scale

Since 2017, a unified platform automating inventory and ordering across 300+ stores — one source of truth, fuller shelves, fairer prices.

Platform live across 300+ stores Show case study →

Unified promotion planning with higher forecast accuracy

Working with Mondelez since 2011 — forecast accuracy raised from 50% to 70%, improving promotion decisions.

+20 pp forecast accuracy Show case study →

AI-based inventory optimization for 490 pharmacies

VERITICO STOCK deployed across a national pharmacy network — automated ordering and optimised delivery schedules.

+5% revenue · +4% availability · 2h saved per pharmacy/day Show case study →
Metro

Smarter promotion mix, leaner handouts

VERITICO PROMO cut the promo handout by 25% with the same sales and lifted promotional profitability.

−25% brochure · +1pp promo margin · +3% profit on promoted items Show case study →

Higher availability with less waste at Kosik.cz

VERITICO Stock with automated ordering: 97% availability, −75% waste; fresher goods and leaner operations.

97% availability · −75% waste Show case study →

Distribution route optimization for Jednota Coop

Redesigned distribution routes for 145+ stores — cutting logistics costs by 15% and reducing the fleet from six to five vehicles.

−15% logistics cost · Fleet 6 → 5 Show case study →

Automated stock and promotion planning for Jednota Mikulov

Replaced manual order management with VERITICO Stock and Price — fuller shelves and better-planned promotions.

96% → 98% availability · −90% order time Show case study →

Automated forecasting and ordering for EMOS

EMOS consolidated planning on VERITICO to automate forecasting and ordering across 1,300+ products.

98% availability · −17% stock working capital Show case study →

Inventory optimization for SIKO

On-shelf availability raised to 98.5% while cutting inventory by CZK 40 million and freeing warehouse capacity.

98.5% availability · −CZK 40M inventory Show case study →

Automated replenishment for Terno

Ordering process automated for 150+ stores — availability up and management time down.

+2.13% availability · −1h per location Show case study →

Inventory optimization for CZC.cz

A leading Czech electronics e-shop used VERITICO Stock to manage 40,000 SKUs — availability up and profit up.

+10% availability · up to +8% profit (key categories) Show case study →

Automated inventory and ordering for PRO-DOMA

Centralised AI-driven replenishment with VERITICO STOCK — turnover faster, branch managers freed for higher-value work.

−15% turnover time · 2–3h/day per branch Show case study →

Centralised inventory for Izomat

VERITICO Stock enabled centralised, data-driven replenishment across 90,000+ SKUs — service levels up across the network.

90k+ SKUs centralised · service levels up Show case study →

Production & logistics layout for SIGMA Group

Up to 1,330 m² of production and warehouse space freed up. 10–20% reduction in internal handling routes.

1,330 m² freed · −10–20% handling routes Show case study →

Logistics masterplan for AL INVEST Břidličná

Plant-wide logistics concept with a central dispatch warehouse — flows consolidated and floor space released for growth.

Shared roadmap · Clear investment case Show case study →

Data-driven warehouse layout for dm drogerie markt

A new warehouse in Ostředek with significant savings in warehouse labour intensity and a future-ready concept.

Lower labor cost · Future-proof concept Show case study →
Knuspr

Online grocery operations with Knuspr.de

Demand forecasting and fulfilment optimisation for a fast-growing online grocery operation across Germany.

Online grocery · Multi-DC fulfilment Show case study →

Peak-season S&OP for Mall.cz

Mall.cz used VERITICO Plan to run a disciplined S&OP for the Christmas peak — aligning timing and stock.

Faster delivery · Stabilised warehouse ops Show case study →

Optimising promotion mix for Kofola

VERITICO PROMO unified data across departments and improved promotion forecasting to 76%.

76% promo accuracy · −14% expired stock Show case study →

Inventory & promotion control for a Czech canned-foods leader

Automated production planning and centralised promotion management — inventory capital down while keeping availability.

−12% inventory capital · Full availability Show case study →

S&OP and inventory stabilisation for AG FOODS

Introduced S&OP and stabilised inventory planning — a single, data-driven plan and clearer roles across the team.

One plan · Less firefighting Show case study →

Seasonal inventory optimisation for Zeelandia

VERITICO Stock helps Zeelandia manage strong seasonal demand — availability up while stock capital and turnover time drop.

+9% availability · −18% capital · −36% turnover Show case study →

Automated replenishment for MILK-AGRO

Store replenishment automated with VERITICO Stock — on-shelf availability above 98% with less manual effort.

98%+ availability · Stabilised inventory Show case study →

Assortment & replenishment optimisation for Pompo

Better forecasting, seasonal planning and automated replenishment lifted availability and sped up stock turnover.

+3% availability · Faster turnover Show case study →

Spare-parts inventory for ORLEN Unipetrol

Inventory value cut by 25% while safeguarding the availability of mission-critical spare parts.

−25% inventory value · 100% critical availability Show case study →

Inventory optimisation for a workwear manufacturer

Inventory optimisation software helps buyers order with precision while accounting for long supplier lead times.

Long-lead procurement · Right-sized inventory Show case study →

Short-term demand forecasting for SKF

Short-term forecasting helped SKF navigate COVID-19 volatility, achieving up to 90% accuracy and enabling faster decisions.

90% forecast accuracy Show case study →
VW

Operations & logistics at Volkswagen Slovakia

Production and logistics analysis across one of Volkswagen Group's strategic plants.

Production · Logistics Show case study →

Production ramp-up support for Grupo Antolin Turnov

Secured the on-time launch of a new automotive interior line — crisis management, material flow and dynamic simulation.

On-time launch · Validated logistics concept Show case study →

AutoStore feasibility for Schneider Electric

Feasibility study validated AutoStore for the CEE DC and quantified a capacity uplift up to 300%.

+300% capacity uplift quantified Show case study →

Automated warehouse design for Sportisimo

Growth-ready logistics strategy and automated warehouse concept with footwear sorter and e-shop line.

4-year payback · Growth-ready warehouse Show case study →

Logistics strategy for Bonavita

10-year logistics strategy validated. Export outsourcing recommended over new construction.

10-year strategy · Lower long-term risk Show case study →

Inventory optimisation for Traficon's retail network

Centralised inventory across a nationwide network — availability of top sellers up, dead stock significantly reduced.

Top sellers availability up · Dead stock down Show case study →

WMS selection and rollout for Servisbal

From a halted WMS project to a live system — clear requirements, disciplined vendor selection and hands-on support.

Stable rollout · Clear vendor selection Show case study →
Elektrowin

Carrier cost & network simulation for Elektrowin

Carrier cost model and network simulation — toll impacts validated, negotiation-ready savings scenarios delivered.

+0.6% YoY toll impact on transport cost Show case study →
Plzeňský Prazdroj

Distribution strategy for Plzeňský Prazdroj

Distribution network and operating-model work for one of Europe's largest brewing groups.

Network strategy · Operating model Show case study →
DHL

Operational improvements with DHL

Process and systems optimisation across logistics operations — visibility, standardisation and capacity planning.

Visibility · Capacity planning Show case study →

Distribution planning for a vaccine network

A long-term partnership moved vaccine distribution from manual planning to a robust routing and territory model.

Strict handling · Quick response to policy Show case study →

Distribution strategy for donated ready meals

Efficient distribution strategy for donating ready meals from canteens — reusable scenario model for food donation guidance.

Hundreds of thousands of CZK saved monthly Show case study →
Microsoft

Trusted by Microsoft

VERITICO STOCK and PRICE software is listed in the Microsoft Azure Marketplace.

Gartner

Listed by Gartner

Representative vendor in the "Market Guide for Retail Forecasting and Replenishment Solution 2022".

Have a similar problem on your desk?

Tell us what you're trying to fix. We'll share the closest comparable rollout — the numbers, the timeline, what it took.