A verified concept and business case
Scenarios validated in a dynamic 3D digital twin — equipment counts, robot utilisation, response times, buffers and cost impact.
Map the current state, test the future scenarios, and design production and automation that hold up in real conditions. We combine data, dynamic simulation and vendor-independent engineering to reduce risk and right-size the investment.
Use it when you are preparing a new line or site, planning automation, or trying to de-bottleneck a production system that has outgrown its original design.
Scenarios validated in a dynamic 3D digital twin — equipment counts, robot utilisation, response times, buffers and cost impact.
External and internal layouts down to workstation micro-layout, with material routes and buffer design.
Capacity constraints, collisions and idle time identified and removed across the whole process.
Manual, semi-automated and automated concepts compared, then vendor-neutral evaluation and negotiation.
Phased rollout with quantified risks and the IT, process, safety and construction impacts aligned.
Scenarios for shifts, maintenance windows and changeovers that protect availability and OEE.
Turn your constraints into a practical, defensible design — before the steel is ordered.
Talk to an expert →Dynamic simulation builds a digital twin of your planned or existing system, letting decision-makers test scenarios under realistic conditions, watch how queues, buffers and resources actually behave, and select a proven option before committing capital. That is what keeps additional costs out of the implementation phase and timelines intact.
Because we are a consulting and technology company rather than one or the other, we also bring forecasting, inventory science and decision support — so the plan stays executable across the wider chain rather than only inside the plant.
See dynamic simulation →
Secured the on-time launch of a new automotive interior line — crisis management, material flow and dynamic simulation.
On-time launch · Validated logistics concept Show full case study →
An automated small-parts warehouse for Škoda Auto in Kvasiny — replacing 42 manual workplaces and saving CZK 26 million per year — while automating the flow from suppliers all the way to the assembly line.
Show full case study →
Up to 1,330 m² of production and warehouse space freed up. 10–20% reduction in internal handling routes.
1,330 m² freed · −10–20% handling routes Show full case study →
Production and logistics analysis across one of Volkswagen Group's strategic plants.
Production · Logistics Show full case study →
Process and systems optimisation across logistics operations — visibility, standardisation and capacity planning.
Visibility · Capacity planning Show full case study →Tell us what you are planning to build or change. We will show you what simulation would reveal before you commit the capital.