A board-ready business case
A structured OPEX and CAPEX model with clear payback and sensitivity analysis.
We build board-ready business cases for manufacturing, logistics and maintenance investments. Vendor-independent feasibility work, dynamic simulation and cost modelling translate the options into genuinely comparable OPEX, CAPEX and ROI scenarios with quantified risk.
You get a clear recommendation, an implementation path, and numbers you can defend to both finance and operations.
A structured OPEX and CAPEX model with clear payback and sensitivity analysis.
Dynamic simulation validating capacity, buffers and response times.
Cost risks identified and unnecessary expenditure removed before approval.
A technology-agnostic comparison that reflects your real processes.
OEE, staffing, transport and service level impacts quantified rather than assumed.
From design to go-live with outcomes that can be measured afterwards.
Get a business case that stands up to finance — and to the review a year later.
Talk to an expert →We apply AI where it moves the needle — forecasting demand and flows, optimising inventory and pricing, and supporting complex multi-criteria decisions with better accuracy and less delay. That underpins the scenario modelling and materially strengthens the reliability of the ROI projection.
Where useful, VERITICO supports investment cases with distribution strategy planning and precise simulation, plus inventory and replenishment models that produce realistic operating cost baselines rather than optimistic ones. You choose the scope; we plug in the relevant parts.
Feasibility study validated AutoStore for the CEE DC and quantified a capacity uplift up to 300%.
+300% capacity uplift quantified Show full case study →
Up to 1,330 m² of production and warehouse space freed up. 10–20% reduction in internal handling routes.
1,330 m² freed · −10–20% handling routes Show full case study →
10-year logistics strategy validated. Export outsourcing recommended over new construction.
10-year strategy · Lower long-term risk Show full case study →
Plant-wide logistics concept with a central dispatch warehouse — flows consolidated and floor space released for growth.
Shared roadmap · Clear investment case Show full case study →
A new warehouse in Ostředek with significant savings in warehouse labour intensity and a future-ready concept.
Lower labor cost · Future-proof concept Show full case study →
Carrier cost model and network simulation — toll impacts validated, negotiation-ready savings scenarios delivered.
+0.6% YoY toll impact on transport cost Show full case study →Send us the investment you are preparing. We will tell you which assumptions finance will challenge first — and how to evidence them.